Engine rolling on newly constructed Bedi Port Rail Connectivity line successfully completed on 21.05.2022
- Bedi Port, Jamnagar gets rail connectivity successfully completed in PPP model. – Ministry of Ports, Shipping and Waterways
- The 1st Load of Coal has been Successfully Dispatched Through newly developed Railway Line at Bedi Port, Jamnagar
- बेड़ी बंदरगाह से नए ट्रेन रूट पर कोयला लेकर रवाना हुए ट्रेन
- (1) KATOSAN –CHANASMA-RANUJ GAUGE CONVERSION FROM METRE GAUGE TO BROAD GAUGE
- (2) BEDI PORT LAST MILE CONNECTIVITY